Product Page 3
Our welfare unit 20 foot provides facilities for up to 16 people working on site. This unit has a separate office space as well as a separate drying room in the back. Also available in 12 foot and 16 foot.
The unit features a canteen and seating area, office space, chemical toilet and drying room. The 20 foot welfare unit is towable and therefore offers flexibility as well as security to your construction site. As with all of our construction units, this welfare unit 20 foot is HSE compliant.
This is a unique sized towable welfare unit which offers a large space as well as the flexibility of having a towable unit. Please call our friendly sales team on 0800 371994 for more information.
Specifications
Welfare Units 20 Foot | |
---|---|
Width | 2.4m |
Height | 2.75m |
Length | 6.1m |
Brochures
Features
- Canteen and bench seating for up to 16 people
- Separate toilet and drying room
- Unique hydraulic axles for setup in 30 seconds
- Separate office space
- Optional water top up and diesel refill
- Free weekly servicing of the chemical toilet
- HSE compliant
Why order your 20 foot welfare unit hire from Site Equip?
-
Fast response, we will not only respond to your enquiry immediately but we will also deliver same day and next if required
-
Personal Service, our friendly team of professional will ensure your requirements are met
-
Reliable, throughout the length of your groundhog welfare unit hire you will have full support of our in house team of fitters and mechanics
-
Professional Service, we pride ourselves on providing the best service possible, and ensure all our staff our highly qualified within their field
-
Delivery system, we can track your delivery on route to your project
20 foot welfare unit hire coverage and delivery
All of our welfare units are easily towable, and can be hooked up to any vehicle for manoeuvring not only site to site but within your building project as it develops. Additionally the towable factor helps reduce the initial cost of transport, compared to the static version and once they are on site they lower to the ground via hydraulics to be secure the unit in minutes. Meeting all Health and Safety Executives requirements for welfare on remote sites. Site Equip can deliver to any project across the South of England.